Rigging | How To's | Safety and Training | By Columbus McKinnon Training | Jan 01, 0001
“Can a Hammerlok coupling link be used to repair hoist chain?”
Mechanical coupling links such as Hammerloks should not be used to join hoist load chain together. This presents a number of safety hazards to the operator and can cause possible damage to the hoist. Hoist load chain when damaged, worn, or when a longer reach is desired must be replaced with the proper length (one piece) from the original manufacturer.
Hoist chain cannot be repaired nor should a mechanical coupling link be used to repair broken links. If the hoist load chain broke due to an overload situation, a full breakdown and inspection of the hoist must be performed in accordance with ASME B30.16 and manufacturer’s guidelines.
Articles authored by "Columbus McKinnon Training" were written by industry professionals with decades of unique and in-depth experience in the material handling industry who are no longer employed by Columbus McKinnon.
Columbus McKinnon's website and/or mobile terms, privacy and security policies don't apply to the site or app you're about to visit. Please review its terms, privacy and security policies to see how they apply to you.