Crane Systems | By Columbus McKinnon Training | Aug 20, 2010
The complete inspection requirements for Overhead Top Running Double Girder Bridge Cranes in regular service in the United States are governed by the following two regulations:
OSHA 1910.179 (j)(1)(ii)(b) and ASME B30.2-2.1.1(2) which state that Periodic Inspections are required on 1-12 month intervals.
OSHA requires Certification Records at one month intervals which include the date of inspection, the signature of the person who performed the inspection and the serial number (hoist), or other identifier (location of the hoist) of the hook, chain or running rope that was inspected.
The three hoist/crane components that require “Certificate of Record” are:
Articles authored by "Columbus McKinnon Training" were written by industry professionals with decades of unique and in-depth experience in the material handling industry who are no longer employed by Columbus McKinnon.
Columbus McKinnon's website and/or mobile terms, privacy and security policies don't apply to the site or app you're about to visit. Please review its terms, privacy and security policies to see how they apply to you.